Can I build an ADU in Boothbay Harbor, Maine?
Yes. Since May 2025, Boothbay Harbor allows one accessory dwelling unit per lot with a single-family home. It can be inside, attached or detached, must have 190 to 800 sq ft of interior floor area, needs no extra parking, and can't be rented for less than four months. The town doesn't require you to live on the property.
| ADUs per lot | 1, on a lot with a single-family home [1] |
| Attached or detached | Either: inside, attached to, or a new separate building [2] |
| Size | 190 to 800 sq ft interior floor area [3] |
| Porches, decks, patios | Up to 25% of the ADU's interior floor area [4] |
| Extra parking | None required [7] |
| Density / lot area | ADU not counted as a unit [6] |
| Minimum rental term | 4 months when rented for pay [11] |
| Building permit fee | $0.50/sq ft (min. $100) plus $100 application fee [13] |
What the town allows
The May 2025 Town Meeting adopted a new ADU section, §170-31.1. We read it in the meeting minutes (the amendment as voted), not the codified Chapter 170, which we couldn't access. You can have one ADU per lot, and it must be accessory to a single-family home on the same lot [1]. It can be inside the house, attached to it, or a new separate building [2]. The ADU must have 190 to 800 square feet of interior floor area [3], and porches, decks or patios can't exceed 25% of that area [4]. It must stay secondary in scale and visual prominence to the main house [5]. The ordinance has no owner-occupancy requirement.
Density, parking and utilities
An ADU isn't counted as a unit for density or minimum lot area [6], and no extra parking is required [7]. Otherwise it must meet the district's normal dimensional standards. A separate entrance must meet egress code, and water and sewer must be adequate. On a septic lot, the ADU counts as a separate dwelling unit for septic design [10].
Which zones and who approves
The approving body is whoever the §170-27 use table names for ADUs [8]. The printed minutes add an ADU line to that table, but the entry reads only "P" and doesn't say which district columns it covers [9]. We can't confirm which districts allow ADUs or whether the Code Enforcement Officer or the Planning Board approves them. In the Shoreland Zone (within 250 feet of water), all dimensional requirements must be met for each additional dwelling unit, with no ADU exemption in the text we have [12]. A shoreland lot may need extra lot area and shore frontage for an ADU; ask the Code Enforcement Officer.
Renting it out
An ADU can't be rented for less than four months when payment is involved. This condition goes on its certificate of occupancy [11].
Fees
New residential space costs $0.50 per square foot (minimum $100) [13], plus a $100 application fee [14]. These come from the 2025-2026 fee schedule; the town adopted a 2026-2027 schedule in June 2026 that isn't posted, so confirm current fees.
State law
Maine's ADU law (30-A M.R.S. §4364-B) may override parts of this section. The town's 190 sq ft minimum is larger than the 160 sq ft minimum the state building codes board set in 2025, so the smaller state minimum may apply. The town allows ADUs only with a single-family home; starting July 1, 2027, state law will also require towns to allow ADUs with 2- and 3-unit buildings and will bar requiring Planning Board approval for an ADU, which matters if the use table sends ADUs there.
See how Boothbay Harbor compares with 8+ other Maine towns on accessory dwelling units (adus) →
Next steps
- Call the Code Enforcement Office (207-633-3671) to confirm your zoning district allows an ADU and whether the Code Enforcement Officer or the Planning Board will review it.
- If the lot is on sewer, get the Boothbay Harbor Sewer District to sign the application. If it's on septic, have a septic system designed that treats the ADU as a separate dwelling unit.
- Submit a Building Permit Application with a site plan showing distances to property lines and road centers, floor plans showing the 190-800 sq ft interior area, and building, energy and egress code details.
- Include the $100 application fee. The permit fee ($0.50/sq ft, minimum $100) is calculated during review. If you're within 250 feet of water or in a flood zone, ask about shoreland and flood hazard permits.
Common questions
- Are ADUs allowed in Boothbay Harbor, Maine?
- Yes, with a permit. Since May 2025, Boothbay Harbor allows one accessory dwelling unit per lot with a single-family home, inside, attached or detached. The printed use-table entry doesn't say which zoning districts allow ADUs or whether the Code Enforcement Officer or Planning Board approves them, so confirm with the Code Enforcement Office. These rules come from the town meeting minutes, not the codified Land Use Code.
- How big can an accessory dwelling unit be in Boothbay Harbor, Maine?
- An ADU must have 190 to 800 square feet of interior floor area, and porches, decks or patios can't exceed 25% of that area. It must stay secondary in scale to the main house. Maine's ADU law may override the town's minimum, since the state building codes board set a 160 sq ft minimum in 2025.
- Do I have to live on the property to have an ADU in Boothbay Harbor, Maine?
- No. Boothbay Harbor's ADU section has no owner-occupancy requirement. An ADU also isn't counted as a unit for density or minimum lot area, and no extra parking is required. In the Shoreland Zone, a lot may need extra lot area and shore frontage for an ADU, so ask the Code Enforcement Officer.
- Can I Airbnb my ADU in Boothbay Harbor, Maine?
- No. An ADU in Boothbay Harbor can't be rented for less than four months when payment is involved, and this condition goes on its certificate of occupancy. That rules out short Airbnb or VRBO stays in an ADU.
- How much is an ADU building permit in Boothbay Harbor, Maine?
- Under the 2025-2026 fee schedule, new residential space costs $0.50 per square foot (minimum $100), plus a $100 application fee. The town adopted a 2026-2027 schedule in June 2026 that isn't posted, so confirm current fees with the town.
Maine's statewide ADU law
Under 30-A M.R.S. §4364-B (first passed as LD 2003 in 2022), a town must allow at least one accessory dwelling unit (ADU) on a lot with a single-family home anywhere homes are allowed. Towns had to comply by 2024.
Rules in effect now:
- It can be inside the house, attached, or a new detached building.
- One ADU per lot is exempt from density limits.
- No extra parking can be required beyond what the house already needs.
- Setbacks are the same as for the house.
- Minimum size: the state building codes board set 160 sq ft in 2025. Towns may set a maximum size.
- Before you can move in, you must show the ADU has adequate water and septic/sewer.
- In the shoreland zone ADUs must meet shoreland rules, but towns can't ban them there outright.
- Sprinklers aren't required unless the ADU is in or attached to a building with more than 2 units.
Coming July 1, 2027 (LD 1829 of 2025, pushed back by LD 2173 in 2026): towns can no longer require the owner to live on the property, ADUs must also be allowed next to 2- and 3-unit buildings, and towns can't require planning board approval for an ADU. Towns may still regulate short-term rentals in ADUs. Private covenants and HOA rules can be stricter.
What the ordinance says
- §170-31.1(A) (adopted 2025 ATM Art. 23), 2025 Annual Town Report, incl. Annual Town Meeting Minutes May 2-3, 2025 (adopted Land Use Code amendments, Arts. 19-27), p. 127
Accessory dwelling units (ADU/ADUs) shall be accessory to the use ofthe premises as asingle-family dwelling and shall be onthe same lot as a single- family dwelling unit. Only one ADU shall be permitted per lot.
- §170-113(B), definition of Accessory Dwelling Unit (adopted 2025 ATM Art. 23), 2025 Annual Town Report, incl. Annual Town Meeting Minutes May 2-3, 2025 (adopted Land Use Code amendments, Arts. 19-27), p. 128
A self-contained dwelling unit located within, attached to, or sharing a wall with a single- family dwelling unit or as a new structure for the primary purpose of creating an accessory dwelling unit located on the same parcel of land.
- §170-31.1(C)(1), 2025 Annual Town Report, incl. Annual Town Meeting Minutes May 2-3, 2025 (adopted Land Use Code amendments, Arts. 19-27), p. 127
ADUs shall have an interior floor area of at least 190 square feet, but no larger than 800 square feet.
- §170-31.1(C)(2), 2025 Annual Town Report, incl. Annual Town Meeting Minutes May 2-3, 2025 (adopted Land Use Code amendments, Arts. 19-27), p. 127
Exterior floor areas, including but not limited to porches, decks, or patios, may be permitted but shall not exceed 25% of the ADU’s interior floor area.
- §170-31.1(C)(2), 2025 Annual Town Report, incl. Annual Town Meeting Minutes May 2-3, 2025 (adopted Land Use Code amendments, Arts. 19-27), p. 127
This includes ensuring the ADU is secondary in scale and visual prominence to the single-family dwelling and minimizing impacts on surrounding properties.
- §170-31.1(B)(1), 2025 Annual Town Report, incl. Annual Town Meeting Minutes May 2-3, 2025 (adopted Land Use Code amendments, Arts. 19-27), p. 127
An ADU shall not be counted as a unit when calculating density or minimum lot area per dwelling unit.
- §170-31.1(B)(2), 2025 Annual Town Report, incl. Annual Town Meeting Minutes May 2-3, 2025 (adopted Land Use Code amendments, Arts. 19-27), p. 127
Minimum parking requirements in §170-50 Parking Standards. No additional parking spaces shall be required for ADUs.
- §170-31.1(C), 2025 Annual Town Report, incl. Annual Town Meeting Minutes May 2-3, 2025 (adopted Land Use Code amendments, Arts. 19-27), p. 127
In zoning districts where ADUs are allowed, the reviewing authority according to §170-27 Schedule of Uses shall approve an ADU upon a determination that the following conditions are met:
- 2025 ATM Art. 23, I: §170-27(E) Schedule of Uses, 2025 Annual Town Report, incl. Annual Town Meeting Minutes May 2-3, 2025 (adopted Land Use Code amendments, Arts. 19-27), p. 125
Under the heading “Residential Uses,” following the item “Single-family dwellings”, anew item line is added to read “Accessory dwelling Units20”. P”,
- §170-31.1(C)(4)(b), 2025 Annual Town Report, incl. Annual Town Meeting Minutes May 2-3, 2025 (adopted Land Use Code amendments, Arts. 19-27), p. 127
ADUs in areas not served by municipal or private sewers shall be treated as a separate dwelling unit for the purposes of septic design.
- §170-31.1(D), 2025 Annual Town Report, incl. Annual Town Meeting Minutes May 2-3, 2025 (adopted Land Use Code amendments, Arts. 19-27), p. 128
ADUs shall not be rented or leased for a duration of less than four months when financial compensation is involved.
- § 170-101.10 A(5) Minimum lot standards, Land Use Ch. 170, Article VIII Shoreland Zoning - eCode360
If more than one residential dwelling unit, principal governmental, institutional, commercial or industrial structure or use, or combination thereof, is constructed or established on a single parcel, all dimensional requirements shall be met for each additional dwelling unit, or principal structure, or use.
- Building Permit Fee Schedule § 170-18 (Residential), Town of Boothbay Harbor Fee Schedule 2025-2026, p. 1
Home or residential units, including additions. $0.50 sq/ft or Minimum $100.00
- Building Permit Application, completeness checklist, Building Permit Application (fillable) with completeness checklist, p. 2
Please remember to include the $100 application fee with your complete application packet. Your building permit fee will be in addition to the application fee and will be calculated during application review.