Home › Maine › Windham › Swimming Pools

Swimming pool rules in Windham, Maine

Windham, Cumberland County · Ordinances checked 2026-10-15 · Reviewed · 7 cited sections

Allowed with a permit

Yes. Windham's Land Use Ordinance treats a pool as an accessory structure, so you need a building permit ($50, plus electrical permit fees for the pump and wiring), and the pool must meet your zone's setbacks: 10 feet from side and rear lot lines in the residential districts. The ordinance has no pool fence rule; barrier requirements depend on the building code Windham enforces, which we didn't review, so ask Code Enforcement.

How a pool is classifiedAccessory structure (with porches, garages and decks) [1]
Side and rear setback (RL, RM, FR, F)10 feet [3]
Front setback (RL)30 feet [4]
Building permit fee$50 [6]
Electrical permit fee (swimming pool line)$50 (the schedule also lists a $50 electrical application fee) [7]
Pool fence/barrierNo rule in Ch. 120; set by the building code (not reviewed) [1]

Pools are accessory structures

Windham's Land Use Ordinance (Chapter 120) lists pools, along with porches, garages and decks, as structures that count as accessory uses, whether they're attached to the house or freestanding [1]. That means a pool has to meet the setbacks, because setbacks are measured from any structure to the lot line or street [2]. This applies to in-ground and above-ground pools alike; the ordinance doesn't distinguish them.

Setbacks

In the Light-Density Residential district, keep the pool at least 10 feet from side and rear lot lines [3] and behind the 30-foot front setback [4]. The Medium-Density Residential, Farm-Residential and Farm districts use the same side and rear setbacks, with a similar front setback (deeper in Farm). Ask Code Enforcement for the numbers in your district. On a corner lot, the front setback applies on both street sides.

Not a "water body"

The ordinance's definition of a water body specifically leaves out swimming pools [5], so your pool doesn't trigger shoreland or wetland setbacks of its own. If your lot is within the shoreland zone of a lake or pond, though, Chapter 185 applies to the pool like any other structure.

Permits and fees

The Code Enforcement Department issues the building permit. The fee schedule lists a $50 building permit fee for a swimming pool [6]. Its electrical permit table lists $50 for a swimming pool alongside a $50 application fee [7]; ask whether both apply. You apply with a plot plan showing your lot, buildings and setback lines.

Fences, barriers and hot tubs

We found no pool fence, gate or barrier requirement in Chapter 120, and no hot tub rules. Maine's statewide building code doesn't include the pool appendix, so barrier rules depend on what Windham has adopted (see the state rules on this page). Windham's building code chapter wasn't among the documents we reviewed, so confirm the fence and gate requirements before you buy a pool or a cover.

See how Windham compares with 8+ other Maine towns on swimming pools →

Next steps

  1. Call the Windham Code Enforcement Department (207-894-5960 ext. 1) to confirm your district's setbacks, whether you're in the shoreland zone, and the required pool barrier.
  2. Draw a plot plan showing the pool at least 10 feet from side and rear lot lines and behind the front setback.
  3. Apply for the swimming pool building permit ($50) and an electrical permit for the pump and wiring.
  4. Install the fence, gates and alarms Code Enforcement requires before filling the pool, and schedule the inspections.

Common questions

Do I need a permit for a pool in Windham, Maine?
Yes. Windham treats a pool as an accessory structure, so you need a building permit ($50) from Code Enforcement, plus electrical permit fees for the pump and wiring. This applies to in-ground and above-ground pools alike.
How far does a pool have to be from the property line in Windham, Maine?
At least 10 feet from side and rear lot lines in the residential districts. In the Light-Density Residential district it must also be behind the 30-foot front setback; ask Code Enforcement for the front setback in other districts.
Does a pool need a fence in Windham, Maine?
It depends on the building code. Windham's Land Use Ordinance has no pool fence, gate or barrier rule; barrier requirements depend on the building code Windham enforces, which we didn't review. Confirm the requirements with Code Enforcement before you buy a pool or a cover.
Are there hot tub rules in Windham, Maine?
We found no hot tub rules in Windham's Land Use Ordinance (Chapter 120). Windham's building code chapter wasn't reviewed, so ask Code Enforcement before installing one.

Maine state rules for pools

Building code (MUBEC): Maine's statewide building code adopts the 2021 International Residential Code, effective April 7, 2025. It must be enforced in towns with more than 4,000 residents. Smaller towns may choose to enforce it. Where it's enforced, your code officer applies the code's pool and spa provisions, including barrier (fence and gate) requirements, along with any town permit rules.

  • Maine did not adopt the IRC appendix that covers pools (Appendix AG).
  • State law lets a town adopt the pool-fencing standards in Appendix G of the 2009 IRC, without changes, even though it's outside the statewide code (10 M.R.S. §9724).
  • So pool barrier rules depend heavily on your town: whether it enforces MUBEC, and whether it adopted the 2009 Appendix G fencing standards. Ask your code enforcement officer before you build.

Shoreland zone: A pool is a structure. Within 250 ft of a great pond, river, tidal water or wetland (75 ft of a stream), it must meet the shoreland setbacks, generally 100 ft from GPA great ponds and 75 ft from other waters. It also counts toward the 20% limit on non-vegetated lot coverage.

Hot tubs and spas follow the same code path as pools.

State sources: 10 M.R.S. §9724 (MUBEC application; pool fencing exception) · Bureau of Building Codes & Standards: MUBEC Standards and Amendments (eff. April 7, 2025) · MUBEC Rule Chapter 5: IRC adoption and Maine amendments (16-642 CMR 5) · DEP Chapter 1000: Guidelines for Municipal Shoreland Zoning Ordinances

What the ordinance says

Exact text from Windham's published ordinances. Section numbers are as printed in the source.

  1. § 120-301 Definitions, "Use, accessory", Chapter 120 Land Use - full eCode360 printout of 2026-02-04 with staff/attorney PL 385 redline (working draft, Mar 2, 2026), p. 37
    USE, ACCESSORY — A use customarily incidental and subordinate to the principal building or use and located on the same lot with such principal building or use. For the purposes of this chapter, the following structures, either attached to or detached from the primary use, shall be considered accessory uses: porches, garages, pools, and decks.
  2. § 120-301 Definitions, "Setback", Chapter 120 Land Use - full eCode360 printout of 2026-02-04 with staff/attorney PL 385 redline (working draft, Mar 2, 2026), p. 34
    SETBACK — The distance between any structure and the nearest lot line or street.
  3. § 120-408E(5)-(6) Light-Density Residential District, Chapter 120 Land Use - full eCode360 printout of 2026-02-04 with staff/attorney PL 385 redline (working draft, Mar 2, 2026), p. 50
    (5) Minimum side setback: 10 feet. (6) Minimum rear setback: 10 feet.
  4. § 120-408E(4)(a) Light-Density Residential District, Chapter 120 Land Use - full eCode360 printout of 2026-02-04 with staff/attorney PL 385 redline (working draft, Mar 2, 2026), p. 50
    (a) Standard: 30 feet. The minimum front setback of a lot may be reduced to the average setback distance of the existing buildings located on the lots to either side of said lot.
  5. § 120-301 Definitions, "Water body", Chapter 120 Land Use - full eCode360 printout of 2026-02-04 with staff/attorney PL 385 redline (working draft, Mar 2, 2026), p. 38
    This definition does not include swimming pools.
  6. Master Fee Schedule, Ch. 28 Building Construction, Building Permit Application Fees, Town of Windham Master Fee Schedule (last amended by Council May 26, 2026), p. 1
    Demolition $50 Swimming Pool $50 Re-inspection Fee $100
  7. Master Fee Schedule, Electrical Permit Application Fees, Town of Windham Master Fee Schedule (last amended by Council May 26, 2026), p. 2
    Swimming Pool $50 Generator $50
This page summarizes Windham's posted ordinances as of 2026-10-15. Ordinances are amended, and individual lots can have overlays, subdivision covenants, or HOA rules that are stricter. Confirm with Code Enforcement Department (207-894-5960 ext. 1) before you build. Spot an error?