Home › Massachusetts › Andover › Docks, Piers & Floats

Dock, pier and float rules in Andover, Massachusetts

Andover, Essex County · Bylaws checked 2026-10-03 · Reviewed · 4 cited sections

Allowed with board review

A private dock on an Andover pond, lake or river needs a permit from the Andover Conservation Commission, because the town's Wetlands Protection Bylaw covers building on land under water and banks. Dock filings cost $4 per linear foot ($100 minimum). Boat docks aren't allowed on Haggett's Pond or Fish Brook, which are drinking-water sources.

Town approvalConservation Commission permit (building on banks or land under water is regulated) [1]
Filing fee for docks/piers$4 per linear foot; $100 minimum, $2,000 maximum [2]
Haggett's Pond and Fish BrookBoat docks and landings not permitted [3]
Permit termExpires 3 years after issuance (renewable) [4]

These rules come from the Wetlands Protection Bylaw (Aug 2021 printout), the Commission's regulations (revised through July 2026) and, for the overlay district, the 2022 recodified Zoning Bylaw, which may have changed since.

Conservation Commission permit

Andover's Wetlands Protection Bylaw bars anyone from filling, dredging, building on or altering any bank, pond, lake, river, stream or land under water, or land within 100 feet of one, without Conservation Commission approval [1]. A dock, pier or float sits on the bank and over land under water, so it needs a Commission permit. The Commission's fee schedule has a specific category for work on docks and piers, at $4 per linear foot, with a $100 minimum and $2,000 maximum [2] (the "17 & 18" in the quoted line are footnote markers).

You file a Notice of Intent with plans, notify abutters (certified mail, hand delivery or certificate of mailing), and attend a public hearing. The Commission can approve with conditions or deny. The permit must be recorded at the Registry of Deeds before work starts and expires after three years unless renewed [4]. The bylaw and regulations don't set size limits or seasonal-versus-permanent rules, so the Commission decides those case by case.

Watershed Protection Overlay

Zoning allows boat docks and landings in the Fish Brook/Haggett's Pond Watershed Protection Overlay District, except on Haggett's Pond and Fish Brook themselves [3]. Elsewhere in that overlay, zoning also restricts new structures within 50 feet of water bodies, so ask the Planning Division how that applies to a dock on another pond or stream in the district.

State and federal approvals

The local documents don't cover state or federal permits. A dock on a great pond or navigable river may also need a Chapter 91 license from MassDEP, and possibly U.S. Army Corps of Engineers approval (see the state rules on this page).

See how Andover compares with 8+ other Massachusetts towns on docks, piers & floats →

Next steps

  1. Contact the Andover Conservation Commission for a pre-application meeting about your dock location and design.
  2. File a Notice of Intent with plans and the dock fee ($4 per linear foot, $100 minimum), and notify abutters as the bylaw requires.
  3. Ask MassDEP whether your waterbody needs a Chapter 91 license (great ponds and navigable rivers).
  4. Record the Commission's permit at the Essex North Registry of Deeds before construction.

Common questions

Do I need a permit for a dock in Andover, Massachusetts?
Yes. A private dock on an Andover pond, lake or river needs a permit from the Andover Conservation Commission, because the town's Wetlands Protection Bylaw covers building on banks and land under water. The page says a dock may also need state or federal approval.
How much does a dock permit cost in Andover, Massachusetts?
The Conservation Commission's fee for docks and piers is $4 per linear foot, with a $100 minimum and a $2,000 maximum.
Are boat docks allowed on Haggett's Pond in Andover, Massachusetts?
No. Zoning does not permit boat docks and landings on Haggett's Pond or Fish Brook, which are drinking-water sources. Elsewhere in that watershed overlay district, boat docks are allowed, but new structures within 50 feet of water bodies are restricted, so ask the Planning Division.
How long does a dock permit last in Andover, Massachusetts?
An Andover Conservation Commission dock permit expires three years after it is issued unless it is renewed. It must be recorded at the Registry of Deeds before work starts.

Massachusetts state rules for docks and piers

A private dock in Massachusetts usually needs several layers of approval beyond local zoning.

  • Chapter 91 waterways license (MassDEP): any structure, regardless of size, permanent or seasonal, in tidal waters, in a great pond (a pond over 10 acres in its natural state), or in certain navigable rivers needs Chapter 91 authorization (M.G.L. c. 91; 310 CMR 9.00). For small residential docks there are simpler routes:

    • a General License certification for pile-supported residential docks, piers, ramps and floats with no fill or dredging, outside ACECs and Designated Port Areas (310 CMR 9.29)
    • a Simplified License for residential docks up to 600 sq ft below the high-water line (310 CMR 9.10)

    Licenses must be recorded at the Registry of Deeds, and Chapter 91 protects public rights to fish, fowl and navigate.

  • Conservation Commission: dock work in or near wetlands, banks or land under water needs an Order of Conditions under the Wetlands Protection Act (c. 131, §40).

  • Harbormaster: bottom-anchored moorings, floats and rafts (no pilings) can be authorized by an annual permit from the local harbormaster instead of a Chapter 91 license (c. 91, §10A). Mooring fees can't discriminate based on residence.

  • U.S. Army Corps of Engineers: work in navigable waters may also need federal approval. Small private piers and floats are often covered by the Corps' Massachusetts General Permits, which can involve self-verification or pre-construction notification.

State sources: MassDEP, Chapter 91: The Massachusetts Public Waterfront Act · M.G.L. c. 91, §10A (harbormaster mooring permits) · M.G.L. c. 91, §18C (General License for residential structures) · 310 CMR 9.10, Simplified procedures for small residential structures (LII) · 310 CMR 9.29, General License certification (LII) · M.G.L. c. 131, §40 (Wetlands Protection Act) · USACE New England District, Massachusetts General Permit

What the bylaw says

Exact text from Andover's published bylaws. Section numbers are as printed in the source.

  1. Art. XIV, § 2 Jurisdiction, Article XIV Wetlands Protection By-Law (eCode printout, Aug 2021), p. 1
    Except as permitted by the Conservation Commission or as provided in § 3 of this by-law, no person shall remove, fill, dredge, build upon, degrade or otherwise alter the following resource areas: any bank, freshwater wetland, marsh, wet meadow, bog, swamp, vernal pool, reservoir, lake, pond, creek, river or stream, or any land under said waters, or any land within 100 feet of any of the aforesaid resource areas, or any land subject to flooding or inundation by groundwater or surface water, or within 200 feet of any river (collectively, the "resource areas protected by this by-law").
  2. Sec. 6(6)(a) Fees, Category 5, Conservation Commission Wetland Protection Regulations (revised through July 8, 2026), p. 17
    Category 5 ($4.00 per linear foot. Minimum $100.00. Maximum $2,000.00)17 & 18 (a) work on docks, piers, revetments, dikes, etc. (coastal or inland)
  3. Sec. 8.8.4(3) Watershed Protection Overlay District, Permitted Uses, Re-Codified Andover Zoning Bylaw (March 21, 2022 text, adopted as new Article VIII at 2023 ATM) - town PDF, p. 105
    3. Boat docks and landings, except on Haggett’s Pond and Fish Brook, pedestrian and bicycle paths and bridges; and horse paths and bridges;
  4. Art. XIV, § 8 Permits and conditions, Article XIV Wetlands Protection By-Law (eCode printout, Aug 2021), p. 4
    A permit shall expire three years from the date of issuance.
This page summarizes Andover's posted bylaws as of 2026-10-03. Bylaws are amended, and individual lots can have overlays, subdivision covenants, or HOA rules that are stricter. Confirm with Building Division (Building Commissioner - Inspector of Buildings / zoning enforcement) (978-623-8620) before you build. Spot an error?