Can I build an ADU in Wells, Maine?

Wells, York County · Ordinances checked 2026-10-15 · Reviewed · 14 cited sections

Allowed with a permit

Yes. Under the ADU amendment Wells voters adopted on November 4, 2025, you can add one accessory dwelling unit (inside the house, attached, or detached) on a lot with a one-family, two-family or multifamily home, as long as the owner lives in the main home or the ADU. An ADU can have no more than three rooms and a bathroom and must be 190 sq ft (attached) or 400 sq ft (detached) up to a maximum of 800 sq ft. No extra parking is required, but no unit on the lot can be rented for less than 6 months.

Number allowedOne ADU per lot with a one-family, two-family or multifamily home, in all districts where those homes are allowed [9]
Owner-occupancyRequired: the owner must live in the main home or the ADU [1]
What counts as owner-occupiedOwner's primary residence, lived in 183+ days a year [2]
Maximum size800 sq ft of net habitable floor area (raised from 600) [3]
Minimum size190 sq ft net habitable area (attached); 400 sq ft (detached) [3]
RoomsNo more than three rooms and a bathroom [3]
Attached/interior ADU share of a one-family homeNo more than 35% of the building's habitable floor area [4]
Detached ADU setbacksMust meet all applicable setbacks (an existing nonconforming building can be converted without enlarging the footprint) [5]
Extra parkingNone beyond what the house already needs [6]
Minimum rental period6 consecutive months for every unit on an ADU lot (no short-term rentals) [7]
DensityA compliant ADU doesn't count toward lot size or density [10]

Source note

Wells's codified Land Use Ordinance (Chapter 145) is on eCode360, which we couldn't download. This page uses the text of the ADU amendment to §145-10 and §145-55 posted with the November 4, 2025 Special Town Meeting warrant (Article 4, Appendix 1), which voters passed; it took effect on adoption [13]. The document is a redline: added words are underlined and deleted words are crossed out [12]. We read the formatting in the PDF and quote only the adopted wording.

Where and what kind

No more than one ADU is allowed on a lot with one or more one-family, two-family or multifamily dwellings, in all districts where those homes are allowed [9]. The amendment crossed out the old exclusion of the Residential B, Residential D and Beach Business districts, so ADUs are now allowed there too. It can be inside the house, attached, or detached. An ADU is permitted only when the main home or the ADU is owner-occupied [1], meaning the owner's primary residence for 183 days or more a year [2]. A compliant ADU doesn't count toward minimum lot size or density [10], though it may still trigger subdivision review under Chapter 202 [11].

Size and design

An ADU can contain no more than three rooms and a bathroom, needs at least 190 sq ft of net habitable area if attached or 400 sq ft if detached, and can't exceed 800 sq ft of net habitable floor area [3]. The 800 sq ft cap replaced the old 600 sq ft limit, which the amendment crossed out. An ADU inside or attached to a one-family home can't take up more than 35% of the building's habitable floor area [4]. A detached ADU must meet the applicable setbacks, unless it goes into an existing legally nonconforming building whose footprint isn't enlarged [5]. In Residential A, the town's reference chart lists 15 ft from lot lines and 25 ft from the street [14].

Parking, utilities and rentals

No parking is required beyond what the house needs [6]. Before a certificate of occupancy, you must give the Code Enforcement Officer written proof that the ADU is connected to adequate water and wastewater [8]. No unit on the lot, including the main house, may be leased to anyone but an owner-occupant for less than six consecutive months [7].

State law

Starting July 1, 2027, Maine law will bar towns from requiring owner occupancy, so state law may override Wells's owner-occupancy rule from then on. Today, the state building codes board's minimum ADU size is 160 sq ft, smaller than Wells's 190 sq ft (attached) and 400 sq ft (detached) minimums, so state rules may override those minimums. See the state summary on this page.

See how Wells compares with 8+ other Maine towns on accessory dwelling units (adus) →

Next steps

  1. Confirm your zoning district and setbacks with the Wells Code Enforcement Office (207-646-5187).
  2. Prepare a plot plan showing the ADU's location and setbacks, floor plans showing net habitable area, and proof that the owner will live in the main home or the ADU.
  3. Apply for a building permit at the Code Enforcement Office; ask whether your project needs subdivision review under Chapter 202.
  4. Before occupancy, give the Code Enforcement Officer written verification that the ADU is connected to adequate water and wastewater services.

Common questions

Can I build an ADU in Wells, Maine?
Yes. Under the ADU amendment Wells voters adopted on November 4, 2025, you can add one accessory dwelling unit (inside the house, attached, or detached) on a lot with a one-family, two-family or multifamily home, in all districts where those homes are allowed, as long as the owner lives in the main home or the ADU. You'll need a building permit from the Code Enforcement Office.
How big can an ADU be in Wells, Maine?
An ADU can have no more than three rooms and a bathroom and can't exceed 800 sq ft of net habitable floor area. It must be at least 190 sq ft if attached or 400 sq ft if detached, though the state's 160 sq ft minimum may override those minimums. An attached or interior ADU can't take up more than 35% of a one-family home's habitable floor area.
Does the owner have to live on the property for an ADU in Wells, Maine?
Yes, for now. The owner must live in the main home or the ADU as their primary residence for 183 days or more a year. Starting July 1, 2027, Maine law will bar towns from requiring owner occupancy, so state law may override this rule from then on.
Can I Airbnb my ADU in Wells, Maine?
No. On a lot with an ADU, no unit, including the main house, may be leased to anyone but an owner-occupant for less than six consecutive months, so short-term rentals of either unit aren't allowed.
What are the ADU requirements for parking and setbacks in Wells, Maine?
No parking is required beyond what the house already needs. A detached ADU must meet all applicable setbacks, unless it goes into an existing legally nonconforming building whose footprint isn't enlarged. Confirm your district's setbacks with the Code Enforcement Office; in Residential A the town's reference chart lists 15 ft from lot lines and 25 ft from the street.

Maine's statewide ADU law

Under 30-A M.R.S. §4364-B (first passed as LD 2003 in 2022), a town must allow at least one accessory dwelling unit (ADU) on a lot with a single-family home anywhere homes are allowed. Towns had to comply by 2024.

Rules in effect now:

  • It can be inside the house, attached, or a new detached building.
  • One ADU per lot is exempt from density limits.
  • No extra parking can be required beyond what the house already needs.
  • Setbacks are the same as for the house.
  • Minimum size: the state building codes board set 160 sq ft in 2025. Towns may set a maximum size.
  • Before you can move in, you must show the ADU has adequate water and septic/sewer.
  • In the shoreland zone ADUs must meet shoreland rules, but towns can't ban them there outright.
  • Sprinklers aren't required unless the ADU is in or attached to a building with more than 2 units.

Coming July 1, 2027 (LD 1829 of 2025, pushed back by LD 2173 in 2026): towns can no longer require the owner to live on the property, ADUs must also be allowed next to 2- and 3-unit buildings, and towns can't require planning board approval for an ADU. Towns may still regulate short-term rentals in ADUs. Private covenants and HOA rules can be stricter.

State sources: 30-A M.R.S. §4364-B (Accessory dwelling units) · 30-A M.R.S. §4364 (implementation dates) · 25 M.R.S. §2463-B (sprinklers in ADUs) · LD 2173 (P.L. 2025, c. 733) status and chaptered law · Maine Office of Community Affairs, Housing Legislation Guidance (March 2026)

What the ordinance says

Exact text from Wells's published ordinances. Section numbers are as printed in the source.

  1. §145-55.A(9) (as amended Nov. 4, 2025), November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 6
    An accessory dwelling unit is permitted only when the one-family dwelling, two-family dwelling, multifamily dwelling, or accessory dwelling unit is owner-occupied.
  2. §145-10, Definitions, "Owner-occupied" (as amended Nov. 4, 2025), November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 5
    To be considered owner-occupied, the dwelling unit must be the owner’s primary residence, which means the primary location where that owner lives for 183 days or more in a year in the aggregate.
  3. §145-55.A(2) (as amended Nov. 4, 2025; adopted wording, struck text removed), November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 6
    The accessory dwelling unit shall contain no more than three rooms and a bathroom, shall have at least 190 square feet of net habitable area if attached and shall have at least 400 square feet of net habitatable area if detached, and shall not exceed 800 square feet of net habitable floor area.
  4. §145-55.A(4) (as amended Nov. 4, 2025; adopted wording), November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 6
    If the accessory dwelling unit is located within or is attached to a one-family dwelling unit, the accessory dwelling unit shall not occupy more than 35% of the habitable floor area of the building.
  5. §145-55.A(5) (as amended Nov. 4, 2025), November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 6
    If the accessory dwelling unit is detached, then it shall meet all applicable setback requirements unless it is located within an existing legally non-conforming structure, in which case the footprint of the existing structure shall not be expanded.
  6. §145-55.A(7) (as amended Nov. 4, 2025), November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 6
    An accessory dwelling unit may not be subject to any additional parking requirements beyond the parking requirements of the single-family dwelling unit on the lot where the accessory dwelling unit is located.
  7. §145-55.A(10) (as amended Nov. 4, 2025), November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 6
    Therefore, none of these dwelling units can be leased or occupied by persons other than an owner-occupant, or their guests who occupy the dwelling without compensation, for a period of less than six (6) consecutive months.
  8. §145-55.A(6) (as amended Nov. 4, 2025), November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 6
    Prior to the issuance of a certificate of occupancy, the permit holder must provide written verification to the Code Enforcement Officer that the accessory dwelling unit is connected to adequate water and wastewater services.
  9. §145-55.A (as amended Nov. 4, 2025; adopted wording), November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 5
    No more than one accessory dwelling unit shall be permitted on any lot containing one or more one-family dwellings, two-family dwellings or multifamily dwellings in all districts where such dwellings are permitted uses.
  10. §145-55.A (as amended Nov. 4, 2025), November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 5
    An accessory dwelling unit that complies with the requirements of § 145-55.A shall not be deemed a dwelling unit for purposes of determining minimum lot size and maximum density.
  11. §145-55.A(8) (as amended Nov. 4, 2025), November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 6
    The accessory dwelling unit is to be considered a dwelling unit per 30-A M.R.S. § 4401 and may require subdivision review per Chapter 202.
  12. Appendix 1, note on format, November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 5
    NOTE: Proposed additions to existing Code sections are underlined. Proposed deletions of existing Code sections are crossed out.
  13. Appendix 1, Part 3, Effective Date, November 4, 2025 Special Town Meeting Warrant: Article 4 ADU amendment to Ch. 145 (§145-10, §145-55), ADOPTED, p. 6
    This Ordinance shall take effect upon adoption by the Town Meeting.
  14. Zoning Dimensional Requirements chart, Residential A (RA) row (height and setback columns), Zoning Dimensional Requirements Chart (Code Enforcement, updated 2025-03-31), p. 1
    RA 30' / 3 story 25' street row 15' lot line
This page summarizes Wells's posted ordinances as of 2026-10-15. Ordinances are amended, and individual lots can have overlays, subdivision covenants, or HOA rules that are stricter. Confirm with Code Enforcement Office (207-646-5187) before you build. Spot an error?