Do I need a permit for a shed in Wells, Maine?
Yes, every shed in Wells needs a permit from the Code Enforcement Office, whatever its size, including prefab sheds delivered to the site. The residential fee is $75 plus $0.60 per sq ft under 200 sq ft, or $140 plus $0.60 per sq ft over 201 sq ft. The town's reference chart lists lot-line setbacks such as 15 ft in Residential A, 6 ft in Residential B and 10 ft in Residential D. Confirm the setback for your lot, because these come from a town reference chart, not the ordinance, and the chart doesn't say whether sheds get different setbacks.
| Permit required | Yes, for all sheds, including prefab or delivered ones [1] |
| Residential fee, shed under 200 sq ft | $75 plus $0.60 per sq ft [3] |
| Residential fee, shed over 201 sq ft | $140 plus $0.60 per sq ft [4] |
| Lot-line / street setback, Residential A (chart) | 15 ft / 25 ft [6] |
| Lot-line / street setback, Residential B (chart) | 6 ft / 15 ft [7] |
| Lot-line / street setback, Residential D (chart) | 10 ft / 20 ft [8] |
| Lot-line / street setback, Residential C (chart) | 15 ft / 25 ft [9] |
| Lot-line / street setback, Rural (chart) | 25 ft / 25 ft [10] |
| District building height limit (chart) | 30 ft / 3 stories in Residential A, B, C and D; 40 ft / 3 stories in Rural [6] |
Source note
We couldn't download Wells's Land Use Ordinance (Chapter 145), which holds the actual accessory-building rules. This page relies on three Code Enforcement handouts: the building-permit FAQ, the accessory structure permit application, and the Zoning Dimensional Requirements chart (updated March 31, 2025), which is marked for reference only. Treat the numbers as a starting point and confirm them with the Code Office.
Permit
Wells requires a permit for sheds, gazebos and decks [1], and the FAQ says all structures need permits, even ones built off-site and brought in [2]. There's no small-shed exemption in these handouts. Sheds are filed on the Accessory Structure Permit Application. The residential fee is $75 plus $0.60 per sq ft for a shed under 200 sq ft [3] and $140 plus $0.60 per sq ft over 201 sq ft [4]; adding a foundation doubles the square footage counted [5]. The fees may predate the town's newer fee schedule. Starting work before approval brings a stop work order, and the FAQ says reviews take up to about 14 business days.
Setbacks and height
The chart lists setbacks from the street right-of-way and from lot lines for each district. It doesn't list separate figures for accessory buildings, and Chapter 145 may treat small sheds differently, which we couldn't check. As listed: Residential A, 25 ft from the street and 15 ft from lot lines [6]; Residential B, 15 ft and 6 ft [7]; Residential D, 20 ft and 10 ft [8]; Residential C, 25 ft and 15 ft [9]; Rural, 25 ft and 25 ft [10]. (The chart's legend calls RC and RD "Residential C" and "Residential D".) Several districts also list larger setbacks from state highways, cemeteries, seawalls and rivers. The residential districts list a 30 ft / 3-story height limit [6] and Rural 40 ft / 3 stories [10]; these are general district limits, not shed-specific ones.
Near water or in a flood zone
If your lot is in the Resource Protection or Shoreland Overlay district, other rules in §145-32 and §145-33 apply [11], and lot coverage is capped (for example 20% or 40% in shoreland areas, depending on the district). Lots in a flood zone also need a Flood Permit [12].
See how Wells compares with 8+ other Maine towns on sheds & accessory buildings →
Next steps
- Confirm your zoning district and the setbacks that apply to an accessory building with the Wells Code Enforcement Office (207-646-5187).
- Draw a plot plan showing the shed's size and its distance from every property line, the street, and any water or wetland.
- Submit the Accessory Structure Permit Application with the base fee plus the per-square-foot fee, and add a Flood Permit if the lot is in a flood zone.
- Wait for the permit to be issued, then post it where it can be seen from the street before you start.
Common questions
- Do I need a permit for a shed in Wells, Maine?
- Yes. Every shed in Wells needs a permit from the Code Enforcement Office, whatever its size, including prefab sheds delivered to the site. Sheds are filed on the Accessory Structure Permit Application, and starting work before approval brings a stop work order.
- How much is a shed permit in Wells, Maine?
- The residential fee is $75 plus $0.60 per sq ft for a shed under 200 sq ft, or $140 plus $0.60 per sq ft over 201 sq ft. Adding a foundation doubles the square footage counted. The fees may predate the town's newer fee schedule, so confirm with the Code Office.
- How far from the property line does a shed have to be in Wells, Maine?
- It depends on your district. The town's reference chart lists lot-line setbacks such as 15 ft in Residential A, 6 ft in Residential B and 10 ft in Residential D. These come from a reference chart, not the ordinance, and the chart doesn't say whether sheds get different setbacks, so confirm with the Code Enforcement Office.
- Are there extra shed rules near water or in a flood zone in Wells, Maine?
- Yes. If your lot is in the Resource Protection or Shoreland Overlay district, other rules in §145-32 and §145-33 apply and lot coverage is capped, for example 20% or 40% in shoreland areas depending on the district. Lots in a flood zone also need a Flood Permit.
Maine building code and shoreland rules for sheds
Building code (MUBEC): The Maine Uniform Building and Energy Code adopts the 2021 International Residential Code, effective April 7, 2025. It must be enforced in towns with more than 4,000 residents. Smaller towns may choose to enforce it, but they can't adopt any other building code.
- Maine's version of the code says building permits are required "where required by municipal ordinance," and towns can exempt more work from permits.
- The residential code exempts small one-story detached accessory buildings from a building permit. Under the IRC that means up to 200 sq ft.
- Being exempt from a building permit doesn't exempt you from zoning. Setbacks, lot coverage and any land-use permit still apply. Check with your code officer.
Shoreland zone: A shed is a "structure" under the state shoreland rules, so it must meet the water setbacks: generally 100 ft from GPA great ponds and 75 ft from other waters and wetlands. It also counts toward the 20% lot-coverage cap. On a small nonconforming lot where a shed can't meet the setback, the code officer may allow one shed up to 80 sq ft and 8 ft tall, with no utilities. It has to be as far from the water as practical and never closer than the house.
What the ordinance says
- When is a Building Permit Required? (Code Office FAQ), When is a Building Permit Required? (Code Office FAQ), p. 1
Sheds, decks, generators, gazebos, solar systems, landscape walls that retain soil and seawalls (timber or concrete) also require permitting.
- When is a Building Permit Required? (Code Office FAQ), When is a Building Permit Required? (Code Office FAQ), p. 1
All structures require permits. Even if structures are built off-site and brought to the site, they still require permitting.
- Accessory Structure Permit Application, fee list, Accessory Structure Permit Application (sheds, pools, fences over 7 ft, walls), p. 2
Residential Shed under 200sf: $75.00 plus $0.60 per square foot
- Accessory Structure Permit Application, fee list, Accessory Structure Permit Application (sheds, pools, fences over 7 ft, walls), p. 2
Residential Shed over 201sf: $140.00 plus $0.60 per square foot
- Commercial / Residential Worksheet, Accessory Structure Permit Application (sheds, pools, fences over 7 ft, walls), p. 3
When adding a Foundation the Square Footage is Doubled (Foundation + Structure.)
- Zoning Dimensional Requirements chart, Residential A (RA) row (height and setback columns), Zoning Dimensional Requirements Chart (Code Enforcement, updated 2025-03-31), p. 1
RA 30' / 3 story 25' street row 15' lot line
- Zoning Dimensional Requirements chart, Residential B (RB) row (height and setback columns), Zoning Dimensional Requirements Chart (Code Enforcement, updated 2025-03-31), p. 1
RB 30' / 3 story 15' street row 6' lot line
- Zoning Dimensional Requirements chart, Residential D (RD) row (height and setback columns), Zoning Dimensional Requirements Chart (Code Enforcement, updated 2025-03-31), p. 1
RD 30' / 3 story 20' street row 10' lot line
- Zoning Dimensional Requirements chart, Residential C (RC) row (height and setback columns), Zoning Dimensional Requirements Chart (Code Enforcement, updated 2025-03-31), p. 1
RC 30' / 3 story 25' street row 15' lot line
- Zoning Dimensional Requirements chart, Rural (R) row (height and setback columns), Zoning Dimensional Requirements Chart (Code Enforcement, updated 2025-03-31), p. 1
R & tpike east 40' / 3 story 25' street row 25' lot line
- Zoning Dimensional Requirements chart, footnote, Zoning Dimensional Requirements Chart (Code Enforcement, updated 2025-03-31), p. 2
YOUR PROPERTY MAY ALSO BE IN THE RESOURCE PROTECTION DISTRICT - RP SECTION 145-32 OR SHORELAND OVERLAY DISTRICT - SEE SECTION 145-33 FOR OTHER RESTRICTIONS AND REQUIREMENTS.
- Accessory Structure Permit Application, notes, Accessory Structure Permit Application (sheds, pools, fences over 7 ft, walls), p. 2
Lots, Buildings, and Structures located in a Flood Zone are also required to complete a Flood Permit. (Chapter 116-2)